Replace a quotation without losing the accepted revision

Separate a replacement offer from an order already created from an earlier revision.

Give the offer and order separate baselines

Synthetic rule: issuing Q-41 revision 2 supersedes revision 1 for new acceptance. An order already confirmed against revision 1 keeps that snapshot until a separate order amendment is agreed. Drafting a revision does not make it current. The quote register therefore needs both the offer lifecycle and the order link; a single latest-file field cannot describe both.

Filled synthetic operating record
RecordStateScope baselineNext decision
Q-41 r1Superseded for new acceptanceEight setup tasksRetain accepted copy for O-19
Q-41 r2Issued; current offerTen setup tasksUse for a new response
O-19Confirmed from r1Eight setup tasksNo automatic change to ten
Download editable CSV ↓

Follow the revision into the response

  1. Record revision lineage
  2. Issue replacement
  3. Mark prior offer superseded
  4. Keep confirmed order snapshot

A response to r1 after r2 was issued is held for quote clarification; it does not rewrite O-19.

Revision 3 is saved as a draft. Which revision can a new customer response use?

Show the worked answer

Revision 2 remains current. Revision 3 has not been issued; O-19 still retains revision 1.

Replace the supersession policy with your agreed practice. This operating register does not determine contractual effect or authorise changing an existing order.