Withdraw one request from a consolidated draft purchase

Remove only withdrawn demand while preserving other requests and any issued-order boundary.

Prepare the purchasing decision

Synthetic draft P-D combines R-41 for four units and R-42 for six. It has not been issued. R-41 is withdrawn with requester confirmation; R-42 remains active. Reduce the draft to six and update its request links. If the draft had already been issued, a request withdrawal would require an order-change decision instead.

Synthetic purchasing decision record
RecordUnits beforeCurrent instructionDraft effect
R-414Withdraw confirmedRemove 4
R-426Still requiredKeep 6
P-D10Draft; not issuedRevise to 6
Download editable CSV ↓

Complete the recorded outcome

  1. Confirm withdrawn request and order release state.
  2. Remove its units and link from the unissued draft.
  3. Retain remaining demand and rerun draft review.

Do not cancel the entire consolidated draft when another requester still requires its units.

Does R-41’s withdrawal mean the supplier has cancelled an order?

Show the worked answer

No. P-D was never issued. The result is a six-unit draft, not a supplier cancellation or receipt event.

Keep withdrawal evidence and the draft revision so its reduced quantity can be explained later.