Reduce an order quantity after some work is completed

Protect completed work and calculate the remaining eligible reduction before revising an order.

Split completed and unstarted units

Synthetic order O-166 has ten task units: four completed and six unstarted. A requested total of seven can retain four completed units and leave three unstarted, reducing three. A requested total of three is below completed work and cannot be represented as a simple quantity reduction. The fixture excludes in-progress tasks, payments and fees; those require their own decisions.

Filled synthetic operating record
Requested totalCompleted retainedUnstarted after changeDecision
743 = 7 − 4Eligible reduction of 3
440Remove all 6 unstarted units
34 already completedNot a valid negative remainderEscalate scope discrepancy
Download editable CSV ↓

Check the completed floor before changing quantity

  1. Read current total and completion
  2. Compare requested total with completed units
  3. Compute remaining unstarted units
  4. Confirm amendment baseline

If work is in progress, this simple fixture cannot classify it as unstarted; collect its status before calculating a reduction.

Why is reducing ten units to seven not a six-unit cancellation?

Show the worked answer

The total reduction is 10 − 7 = 3. Six were unstarted, but three remain required after retaining four completed units.

The completed floor is an operating assumption, not a statement about refund rights or billable amounts.