Skip to content
Astera Technology

Prepare a release rollback decision

Check application, data and external effects before assuming a previous version can be restored safely.

List what the release changes

Synthetic rollback readiness sheet
ChangeRollback questionEvidence before release
Application versionCan the previous artefact run with current configuration?Known artefact and rehearsal
Database fieldCan old code read new records without loss?Compatibility test
Outbound notificationCan duplicate sends be prevented after rollback?Delivery identity and replay rules
New user recordsHow will writes after cutover be preserved?Reconciliation and recovery owner
Download editable CSV ↓

Choose the stop signal, decision maker and previous version before opening the release window. Record a task-level verification such as creating and reading one synthetic booking. Technical health and successful user behaviour should both inform the decision.

Choose rollback or forward repair with evidence

A release deleted a column that the old version needs. Is switching back the executable sufficient?

Show the worked answer

No. The old version may fail against the changed schema. Use the rehearsed recovery or forward-fix plan, preserving new writes. A backup restore requires its own data-loss and reconciliation decision.

After recovery, check the affected task and a related unaffected task, then record the release and data state actually running. A successful rollback command is not proof that the customer journey is restored.

Related resources

Cloud and system operations →