Skip to content
Astera Technology

Record a future reporting-line change without publishing it early

Retain current and scheduled manager relationships with an explicit effective boundary.

Read the effective-day rule

Fictional S31 reports to M1 until start of day 12, then M2. Supplied decision permits scheduling now; review is day 11. Local directory shows the effective relationship for its review day and retains the next one separately. All days share the organisation’s fictional local calendar.

Manager relationship timeline
RelationshipEffective intervalAt day 11
S31→M1Before day 12 startCurrent
S31→M2From day 12 startScheduled
Download editable CSV ↓

Keep current and scheduled links

  1. Record decision and day 12 boundary
  2. Retain M1 current through day 11
  3. Store M2 as scheduled
  4. Publish M2 from boundary

Do not infer M2 is current because its decision was entered earlier.

Who is shown on day 11 and at day 12 start?

Show the worked answer

M1 on day 11, M2 from day 12 start. There is one effective manager at each time in the supplied model.

Switch at the supplied boundary

Filled administration checks
CaseAction or resultEvidence boundary
Publish M2 on day 11Too earlyFuture effective boundary
Publish M2 at day 12 startCorrectStart included
Download editable CSV ↓

Historical reports use their own reference day. Do not rewrite earlier reporting-line evidence to the new manager.

Related resources