Compare checkpoint inputs with current inputs
The synthetic task paused after checking five fields against specification v1. Current v2 changes fields F2 and F4 only; F1, F3 and F5 are explicitly unchanged. The owner permits reusing checks of unchanged fields and requires rechecking changed fields before resumption.
| Fields | Change finding | Checkpoint treatment |
|---|---|---|
| F1, F3, F5 | Unchanged in v2 | Reuse three checks |
| F2, F4 | Changed in v2 | Reopen two checks |
| Resume record RES-B | v2 scope | Pending changed-field review |
Revalidate the changed subset
- Read paused checkpoint
- Confirm current v2
- Compare changed fields
- Recheck F2 and F4
- Resume with mixed retained and new evidence
If the change list is incomplete, do not assume the remaining fields are unchanged; obtain the complete revision comparison.
Three checks can be retained and two reopened. The resumed record names v2 and links both retained v1 evidence and new changed-field evidence, keeping the basis of each result clear.
May the task resume using all five v1 checks without review?
Show the worked answer
No. Only three unchanged-field checks carry forward; F2 and F4 must be rechecked against v2.