Project work previews
Inspect pending handovers, dependency routes, effort forecasts and staged batches.
A pending task handover with the current owner intact
Inspect the proposed receiver and remaining work without treating a read receipt as acceptance.
An approved provisional route beside unfinished final work
Inspect the changed prerequisite without making a provisional input appear to be final release.
Recorded effort and a local remaining-work draft
Inspect spent and remaining hours independently, with an editable draft that leaves the recorded forecast intact.
Ready and blocked batches in a staged handoff
Inspect the first batch’s evidence while keeping incomplete source references visible on the second.