Skip to content
Astera Technology

Scope a data migration pilot

Choose a small set that exposes mapping and relationship risks before approving the full move.

Choose records by risk

Synthetic pilot sample plan
SampleWhy include itExpected check
Active customer with leading-zero IDIdentity preservation00042 remains 00042
Inactive customer with child recordsStatus and relationshipsStatus retained; children link correctly
Ambiguous source dateMeaning before conversionHeld for review until confirmed
Repeated external identityCollision treatmentNo silent merge
Multiline note in exportExport/import representationContent stays within the intended field
Download editable CSV ↓

Set the pilot exit decision

In a hypothetical 30-row pilot, 28 accepted and two rejected can be an expected result if those two were deliberate invalid cases. Record why each rejection occurred. Require resolved critical mapping gaps, reconciliation of all inputs and an agreed repeat-run result before expanding the batch. A small successful sample is not a statistical guarantee about the entire dataset.

The pilot passes but the full export contains a new status code. What changes?

Show the worked answer

Hold that code for mapping review, add a representative case and repeat the affected checks. Keep the scope change visible rather than assuming it means the same as a known status.

Related resources

System integration services →