Skip to content
Astera Technology

Calculate capacity after the largest worker fails

Compare remaining throughput with a supplied workload and headroom requirement.

Keep throughput units consistent

Synthetic independent workers have sustainable capacities A60,B40,C30 jobs/minute. Failure removes one worker completely. Workload is 65 jobs/minute and local acceptance needs remaining capacity at least workload plus 10 jobs/minute. Capacities are provided scenario constants, not benchmarks.

Single-worker loss worksheet
Lost workerRemaining jobs/minAgainst 75 required
A6070Short 5
B4090Headroom 15 beyond requirement
C30100Headroom 25 beyond requirement
Download editable CSV ↓

Remove the failed capacity

  1. Sum total capacity
  2. Subtract each possible lost worker
  3. Compare minimum with 75

Queue growth is not avoided merely because a short burst fits an instantaneous capacity figure. This drill assumes the supplied sustained rates.

Does the set pass after any one loss?

Show the worked answer

No. Losing A leaves 70, enough for 65 demand but only 5 headroom, below required 10. The worst case is short 5 jobs/minute against 75.

Check demand and headroom separately

Filled decision checks
CaseDecisionReason
Demand-only comparison 70≥65Insufficient policy checkHeadroom condition omitted
Full comparison 70<75Fail5 jobs/min short
Download editable CSV ↓

A revised capacity plan must close the worst-case gap, then be checked under actual workload evidence. Do not call the scenario rate a company availability result.

Related resources

Cloud and system operations →