Bound queue growth during a reduced-capacity window

Calculate linear backlog growth from supplied arrival and drain rates.

Fix the degraded interval

Synthetic window lasts 20 minutes. Queue starts 40 jobs, arrivals 12/min and processing 8/min constant; buffer limit 100 jobs. No drops or retries occur. After recovery, processing 16/min with arrivals still 12/min. These simplified rates are not actual system measurements.

Queue-rate worksheet
PhaseNet jobs/minEffect
Degraded+440+4t
BoundaryAt 15 min100 jobs
Recovered−4Drain to original 40
Download editable CSV ↓

Calculate the net queue rate

  1. Subtract processing from arrivals
  2. Project backlog at each time
  3. Check limit before planning the whole window

The linear projection stops being a valid unlimited-queue model when the buffer limit is crossed; no overflow behaviour is supplied.

When is the limit reached, and what would an unbounded 20-minute projection show?

Show the worked answer

Limit 100 is reached after 15 minutes:(100−40)/4. The unbounded projection is 120 after 20,20 over limit, so the full window is not supported. If 120 were retained in a larger buffer, returning to 40 at net drain 4 would take 20 minutes.

Find the capacity boundary

Filled decision checks
CaseDecisionReason
15-minute degraded windowAt limit 100No headroom remains
20-minute window, limit 100UnsupportedProjection exceeds by 20
Download editable CSV ↓

Choose a shorter window, changed admission rate or explicitly larger buffer before acceptance. A recovery drain plan cannot retroactively prevent earlier overflow.